12/01/2009
Another busy day, 4 new set ups today, Haas VF2 needed to be set up for another part of the assembly. Same jaws same stop and same zero, I need to set up 5 new tools. Set up and prove out and inspection took about 3 hours. Running 53 pieces they should be off machine tomorrow. Cycle time is 8 minutes including load time.
Katie set up the Haas Vf3 on operation 1 of J276, step jaws and an end stop and 8 tools, she did the set up in about an hour. Good work instructions make it much easier to repeat set ups.
Haas Vf1 needed op3 set up on J256. Same jaws same stop and same zero, I need to set up 2 new tools. Set up and prove out and inspection took about 1 hours. Running 55 pieces they will be complete this afternoon sometime. Cycle time is 3 minutes including load time.
I set up Okuma lathe on a 303 stainless steel job, material is 1 inch diameter. I will use a 5C collet to hold the bar; I will set it at 2.25 out of the collet. It has 3 ODs an ID and ¾-16 external threads. Cycle time is about 15 minutes for the first operation. Set up took a couple of hours to prove out and inspect.
Did paper work to ship part and I will deliver after work.